01
Site meteorology
On-site measurements that feed the forecasts and performance reporting.
Pyranometer (plane of array) · Wind speed and direction · Soiling sensor · Temperature and humidity
Energy
Bankable data for solar and wind. Every litre accounted for at fuel depots.
GridEdge gives solar and wind plants on-site meteorology, day-ahead and intraday generation forecasts, and early detection of underperformance. TankSight covers tank levels, leaks and gas at refineries, depots and filling stations.
Operational question
Operator view
Irradiance, plane of array
Met station M-1 · Normal
742W/m²
Forecast error, day-ahead
Model · Normal
6.4%
Tank T-4 level change, 1 h
Depot · Normal
1.2mm
Fenceline VOC
Sensor F-2 · Normal
0.60ppm
Simulated data. Illustrates the IEC 60073 alarm states.
Instrumentation
01
On-site measurements that feed the forecasts and performance reporting.
Pyranometer (plane of array) · Wind speed and direction · Soiling sensor · Temperature and humidity
02
Automated analysis of inverter and turbine data isolates underperforming equipment.
Inverter data · Turbine SCADA · String current
03
Slopes, foundations and drainage around the plant.
Slope displacement · Tiltmeter · Debris-flow sensor · InSAR displacement map
04
Level and temperature gauging, leak detection, certified gas detection and fenceline vapour monitoring.
Tank level gauge · Product temperature · Leak detection · Certified gas detector · Fenceline VOC
GridEdge & TankSight delivery
Every stage delivers a defined output. You decide whether to proceed.
Site inspection or satellite screening. Hazard register, instrumentation plan and budget.
Commercial terms
Fixed price, 2–6 weeks. Credited against the next stage.
GridEdge & TankSight · Energy
2–4 weeks. No equipment on site. The result shows where ground instrumentation is justified.