Construction

SiteSure

Site conditions, measured. Before they become delay, rework or a claim.

Relocatable instrumentation that follows the works: wind at jib height, boundary dust and noise, groundwater in excavations, in-situ concrete temperature, movement of new and adjacent structures, and plant location. It supports your engineers; it does not replace them.

Operational question

“Is wind at jib height within the crane’s operating limit?”

Constraints we address

  • Wind, rain, dust and frost stop work, with no objective record of conditions.
  • Cranes keep lifting in rising wind without a measured value at the jib.
  • Curing and excavation problems surface too late.
  • Neighbour complaints about dust, noise or cracks go unanswered without data.
  • Generators, pumps and tools are lost, idle or out of fuel when needed.

Operator view

SiteSure: simulationNormal
  • Wind at jib height

    Tower crane TC-1 · Normal

    7.5m/s

  • Excavation water level

    Foundation zone C · Normal

    1.60m

  • Concrete core temperature

    Pour P-12 · Normal

    23°C

  • Boundary PM10

    North gate · Normal

    64µg/m³

Simulated data. Illustrates the IEC 60073 alarm states.

Instrumentation

Modular by design.

01

Weather and crane wind

Wind speed at jib height, rainfall and frost, with a stop-lifting alarm.

Anemometer at jib height · Rain gauge · Air temperature · Weather station

02

Boundary dust and noise

Continuous records for permit compliance, with a warning before limits are exceeded.

PM10 / PM2.5 · Noise (LAeq) · Wind direction

03

Excavations and groundwater

Water level, pump run time and soil movement, so supervisors act before access or stability is affected.

Water level · Pump run time · Flow · Piezometer · Displacement sensor

04

Concrete maturity

In-situ temperature gives strength by the maturity method (ASTM C1074): when to strip, when to load, when frost is a risk.

Embedded temperature logger · Maturity-based strength · Air temperature

05

Structural movement

Tilt, cracks and settlement on new and adjacent structures. Data an engineer can rely on.

Tiltmeter · Crack meter · Settlement · Vibration (PPV)

06

Plant, fuel and containers

Location, engine hours and fuel level of generators, pumps and compactors. Alarm when a container opens out of hours.

GPS tracker · Engine hours · Fuel level · Door contact

SiteSure delivery

Four stages. Each one stands alone.

Every stage delivers a defined output. You decide whether to proceed.

Assess

Site inspection or satellite screening. Hazard register, instrumentation plan and budget.

Commercial terms

Fixed price, 2–6 weeks. Credited against the next stage.

  • Site walk: deep excavations, pours, cranes, groundwater and neighbours
  • Monitoring plan tied to method statements and permit conditions
  • Installation plan that adapts as the site evolves

Technical specifications.

SiteSure · Construction

Measured parameters
Anemometer at jib height, Rain gauge, Air temperature, Weather station, PM10 / PM2.5, Noise (LAeq), Wind direction, Water level, Pump run time, Flow, Piezometer, Displacement sensor, Embedded temperature logger, Maturity-based strength, Tiltmeter, Crack meter, Settlement, Vibration (PPV), GPS tracker, Engine hours, Fuel level, Door contact
Telemetry
LoRaWAN, cellular or satellite, selected at site survey
Power
Solar or battery. No mains required at the measurement point
Reporting interval
5–15 min
Alarm delivery
Voice call, SMS, Telegram, email. Recipients and escalation set per site
Forecasting
  • Rain, frost and wind outlook for scheduling pours and lifts
  • Detection of abnormal plant use and fuel loss
  • Trend alarms for settlement, water level and curing
Service
  • Sensors relocated as work fronts advance
  • Scheduled calibration; evidence packs for progress meetings
  • Full data archive at handover, for claims and facility operation
Outcomes
  • Faster, documented stop-work decisions
  • Earlier action on groundwater, movement and curing
  • Higher plant utilisation; fewer losses
  • Objective evidence for clients, inspectors and disputes
Applications
  • Building, road, bridge and tunnel contractors
  • Developers and project managers
  • Quarries, batching plants and building-material suppliers

Start with a satellite screening of your site.

2–4 weeks. No equipment on site. The result shows where ground instrumentation is justified.