Construction
Site conditions, measured. Before they become delay, rework or a claim.
Relocatable instrumentation that follows the works: wind at jib height, boundary dust and noise, groundwater in excavations, in-situ concrete temperature, movement of new and adjacent structures, and plant location. It supports your engineers; it does not replace them.
Operational question
Operator view
Wind at jib height
Tower crane TC-1 · Normal
7.5m/s
Excavation water level
Foundation zone C · Normal
1.60m
Concrete core temperature
Pour P-12 · Normal
23°C
Boundary PM10
North gate · Normal
64µg/m³
Simulated data. Illustrates the IEC 60073 alarm states.
Instrumentation
01
Wind speed at jib height, rainfall and frost, with a stop-lifting alarm.
Anemometer at jib height · Rain gauge · Air temperature · Weather station
02
Continuous records for permit compliance, with a warning before limits are exceeded.
PM10 / PM2.5 · Noise (LAeq) · Wind direction
03
Water level, pump run time and soil movement, so supervisors act before access or stability is affected.
Water level · Pump run time · Flow · Piezometer · Displacement sensor
04
In-situ temperature gives strength by the maturity method (ASTM C1074): when to strip, when to load, when frost is a risk.
Embedded temperature logger · Maturity-based strength · Air temperature
05
Tilt, cracks and settlement on new and adjacent structures. Data an engineer can rely on.
Tiltmeter · Crack meter · Settlement · Vibration (PPV)
06
Location, engine hours and fuel level of generators, pumps and compactors. Alarm when a container opens out of hours.
GPS tracker · Engine hours · Fuel level · Door contact
SiteSure delivery
Every stage delivers a defined output. You decide whether to proceed.
Site inspection or satellite screening. Hazard register, instrumentation plan and budget.
Commercial terms
Fixed price, 2–6 weeks. Credited against the next stage.
SiteSure · Construction
2–4 weeks. No equipment on site. The result shows where ground instrumentation is justified.